Mirzapur. After the construction of the corridor at the famous Vindhyachal Dham, the ring road will be constructed around the temple in view of the convenience of devotees in the second phase. At the same time, it is planned to widen the paths of Ganga Ghats. The temple of Goddess Vindhyavasini Devi, the presiding deity of the famous Siddhapeeth Vindhya region along with Ayodhya and Kashi Vishwanath Temple, has been corridor.
After the Vindhyachal temple, the corridor construction work has been started in the mother Ashtabhuja and Kali Temple located on the triangle path. District Collector Priyanka Niranjan said that after the construction of the corridor, the number of visitors has increased somewhat. He told that the number was in millions in the first year. Now two to three crores have been increased.
In such a situation, it is planned to provide more facilities in view of the number of passengers. The District Magistrate said that in the second phase, the major streets including Vindhyachal Dham are going towards the Ganges Ghats. Those paths will be widened.
He informed that a detailed proposal is being made for construction of ring road around the area. He also inspected the already ongoing construction works. Instructions for inspection of the satsang building site to be constructed in a beere area at Diwan Ghat and the quality of Teen Sand work being installed on the old VIP route.
Also read: Worship of Mukteshwar Mahadev will be fulfilled, Usha, daughter of Banasura, used to worship Shiva