The fare of 10 rupees fixed for Patna Metro. A 3 coach train will run on all these routes from August 15.

The fare of 10 rupees fixed for Patna Metro. A 3 coach train will run on all these routes from August 15.

The dream of the people of Patna is now going to be a reality. Patna Metro is going to start on August 15 this year to get rid of congested, jam and expensive fares. Prime Minister Narendra Modi will inaugurate it. Initially, Malahi Pakri will run a three -coach metro between Pataliputra bus terminal.

💸 Fare 10 to 60 rupees, long distance more profit

The fare of the metro is extremely accessible – between ₹ 10 to ₹ 60. While short distance passengers will get cheaper journey, those who cover long distances will benefit more in rent. The formula with “short distance, high fare – long distance, low fare” will be applicable.

🏗️ 19,500 crore cost, metro will run in total 34.39 km

Two corridors are being built in this project being built at a cost of about ₹ 19,500 crore:

East-West Corridor: 16.94 km

North-South Corridor: 14.45 km
👉 Total Distance: 34.39 km
👉 Total Station: 26 (13 underground + 13 elevated)

The work of laying tracks at 6 stations in the first phase is almost complete.

🚆 Initially 3 coaches, can grow up to 8 later

About 150 people will be able to sit in every coach

If needed, the number of coaches can be increased from 3 to 8

🧳 These modern facilities will be available in the metro:

Air Conditioning (AC Coach)

CCTV security system

Wi-Fi and Mobile Charging Point

Food court, shopping area and parking at metro stations

Route check, ticket booking, and live tracking through mobile apps

🛤️ Metro coaches from Maharashtra and Bengaluru

The first metro coach will reach Patna from Maharashtra next month. The second coach is being built in Bengaluru.
Chief Secretary Amritlal Meena said that Patna Metro is being equipped with all modern features like Delhi Metro.

📋 At a glance – Patna Metro Project

Bindu Information Total Cost ₹ 19,500 Crore Corridor East-West (16.94 km), North-South (14.45 km) Total station 26 (13 underground + 13 elevated) Early route Malahi caught Pataliputra bus terminal coach number in the beginning 3, 8 passenger ability per 150 passenger ability in future, 150 passenger fare starting 150 August 2025 2025252525 2025 20252525

Exit mobile version