Publish Date: | Thu, 10 Mar 2022 11:10 AM (IST)
Gwalior Electricity News: Gwalior. New Zealand Representative. Madhya Kshetra Electricity Distribution Company has prepared an app for the survey of RRDS scheme. The survey of this app scheme is being done. The survey should be completed this month, after that tenders will be done. 375 crore has been approved under the scheme. The location of the work will be locked through GIS survey, so that fraud cannot happen. In the year 2011, under the Energy Reform Program, an investment of Rs 200 crore was made to improve the power distribution system of the city. When the scheme came, the number of subscribers was less than 2 lakhs. AC in the city The trend was less. Due to this the lines were under load. But in 10 years, the number of consumers in the city has reached 2.73 lakh. AC The trend has also increased a lot. Due to this, summer transformers, lines get overloaded. Due to which the city faces tripping and fault. Every year the city suffers a cut. People are worried about electricity. After this work, the city will get relief from tripping and fault. Electricity will be uninterrupted in the city. Also, you will not have to face long faults in storm and rain. Although the survey of the plan was to be completed in February, but there was a technical problem in the arrangement made for the survey. This survey could not be done. For this, the company’s teams went to Jabalpur and they removed the technical deficiency. The number of houses in the city is increasing. New connections are being made, he is in a new residence. AC is more prevalent in these houses. The cooler is out. In 20 years, about 1 lakh 20 thousand houses will increase. The company should have a new infrastructure to provide electricity to these houses. So the plan is being prepared.
Posted By: anil.tomar