Publish Date: | Sat, 05 Mar 2022 08:51 PM (IST)
Collector inspected overbridge under construction
Pipliyamandi (Naiduniya News). On Saturday, Collector Gautam Singh inspected the encroachment becoming a hindrance in the overbridge being built on the railway level crossing 141. The Collector has bluntly told all the officers that they should not hesitate in removing the obstacles coming in the way of development. Those people who have been occupying government land for years, they themselves should back down and should not wait for action.
Collector Gautam Singh, District Panchayat CEO Kumar Satyam along with bridge construction deputy engineer Jasvir Hora were present. The employees of the bridge construction told the demarcations on both sides of the overbridge from Railway Gate Bus Stand to Gandhi Chauraha. During this, the overbridge engineer Krishna Gupta was asked about the electric pole installed on the CC road of the overbridge construction in the front lane of the bungalow near the bypass road, how the pole was installed, the engineer expressed his inability. When he gave voice to the power company officials, Vinoba Tiwari reached Malhargarh Executive Engineer. Collector Gautam Singh bluntly said how did the pole get here. The officials could not give any answer. Later, the contractor’s employee was asked where to put the pole. The employees showed the mark to the collector. While directing the executive passenger, he said that this bridge is being built for everyone, with time the traffic will increase, so people themselves should come forward for development. People’s representatives should also cooperate in the development. The collector asked the police, NP CMO, remove the obstacles hindering the construction, asked TI Tejendra Singh Sengar to cooperate with the city council. Directed CMO Garima Patidar to initiate action.
Posted By: Nai Dunia News Network