The long wait of the people of Delhi and Ghaziabad is over. late sunday night Delhi-Dehradun Expressway Two important parts of the temple have been opened to the general public.
Now you can gallop your car directly from Akshardham of Delhi to Mavikala village of Baghpat. Let us know the features of this new route and how you will benefit from it.
Travel becomes easier: From where to where the road is open?
NHAI has removed barricades near Akshardham.
beginning: Akshardham (Delhi)
Ending: Mavikala Village (Near Baghpat, Khekra)
Overall Length: This open part is about 32 kilometers Is long. In this, Delhi’s share is 14.5 km and Ghaziabad-Baghpat’s share is about 17 km.
Biggest relief: Right now the journey is absolutely free (No Toll)
The best news for the drivers is that at present there is no traffic on this 32 km long stretch. No toll tax will be collectedAlthough a toll booth has been built in Tronica City, initially the journey will be free,
Through which areas will this expressway pass? (Route Map)
This expressway will reach Baghpat, connecting many busy areas of Delhi. Its route passes through these places:
Akshardham, Laxminagar, Geeta Colony
Loha Ka Pul, Shastri Park, New Osmanpur
Kartar Nagar, Khajuri Khas Chowk, Biharipur
Ankur Vihar, Sharda City, Pavi Pushta (Loni)
Mandola up to Baghpat (Mavikala) via NBCC Township.
How will you decide the way forward?
At present this expressway is open only till Mavikala (Baghpat). Further construction work is still going on. If you want to go to Saharanpur or Dehradun, then beyond Mavikala you will have to go to the old Delhi-Saharanpur Road Have to catch it.
Project Highlights
Total Cost: Rs 12,000 crore.
Overall Length: The entire expressway will be 212 kilometers long (Delhi to Dehradun).
Lane: It is a 6 lane greenfield access control expressway.
Connectivity: It has also been connected to ‘Eastern Peripheral Expressway’ in Baghpat, which will make further travel easier.
Some Precautions and Problems
Keep these things in mind before setting out on a journey:
No ramp in Mandola: Due to land dispute, ramp and service road for climbing and descending have not yet been built in Mandola.
Lighting problem: Street lights are broken at many places in Ghaziabad-Baghpat section and the deployment of marshals has not been completed yet. (Drive carefully at night).
With the opening of this new route, the people of North-East Delhi and Ghaziabad will get great relief from traffic jams. If you are planning to go to Baghpat or beyond, then definitely take advantage of this new ‘toll-free’ route, but keep safety in mind.












